Harald | 2020-07-08 02:09:53 |
800 x 1200, 1401 кБ A closer view on Tower 52 of Facility 318 |
|
Harald | 2020-07-08 02:08:04 |
800 x 1200, 1469 кБ Tower 52 of Facility 318 (380 kV/110 kV-power line Pulverdingen-Oberjettingen), a strainer west of Sindelfingen-Maichingen |
|
Harald | 2020-07-06 02:21:58 |
800 x 534, 652 кБ Site of former boxes for the equipment of the base station |
|
Harald | 2020-07-06 02:19:35 |
800 x 1200, 1401 кБ Tower 28 of Facility 318 west of Leonberg. This tower was once used also as cellphone base station. |
|
Harald | 2020-07-06 02:17:55 |
800 x 534, 611 кБ Powerlines west of Leonberg |
|
Harald | 2020-07-05 03:52:51 |
800 x 534, 551 кБ Reconstruction work of powerline Hoheneck-Herbertingen east of Eningen unter Achalm |
|
Harald | 2020-07-04 06:27:18 |
800 x 534, 550 кБ High voltage lines running to Oberjettingen substation south of Sulz am Eck |
|
Harald | 2020-07-04 06:26:19 |
800 x 534, 499 кБ High voltage lines running to Oberjettingen substation south of Sulz am Eck with the planets Jupiter and Saturn in the background |
|
Harald | 2020-07-02 02:03:33 |
800 x 1200, 1359 кБ Tower 75 of Facility 4508 (powerline Hoheneck-Herbertingen). As it is situated close to a hospital with a helipad, it has an aircraft warning light on its top. |
|
Harald | 2020-06-28 03:59:27 |
800 x 1200, 1309 кБ A tower of 110 kV-powerline Osterburken-Ingelfingen also used as transmitter site near Dörnishof |
|
Harald | 2020-06-28 03:57:35 |
800 x 297, 297 кБ 110 kV-power line Osterburken-Ingelfingen at the crossing of motorway Heilbronn-Würzburg (A81) |
|
Harald | 2020-06-27 04:25:49 |
800 x 1200, 1328 кБ Tower 9 of Facility 610, a strainer with transposition of the 110 kV-line Herrenberg-Oberjettingen |
|
Harald | 2020-06-27 03:46:18 |
800 x 1200, 1379 кБ Tower 87 of Facility 318 (Powerline Pulverdingen-Oberjettingen) |
|
Harald | 2020-06-27 03:45:07 |
800 x 1200, 1356 кБ Tower 7609 is part of the traction power line Stuttgart/Zazenhausen - Eutingen |
|
Harald | 2020-06-27 03:41:18 |
800 x 1200, 1269 кБ Tower 7609, an angle-suspension tower for a double-circuit single-phase 110 kV AC line of the German Railway Company. |
|
Harald | 2020-06-25 01:34:07 |
800 x 534, 590 кБ Powerlines west of Magstadt, Baden-Württemberg, Germany. The large towers belong to the 380 kV/110 kV powerline Pulverdingen-Oberjettingen, the medium-size towers are used by the 380 kV/220 kV-powerline Hoheneck-Herbertingen and the small towers with 4 conductors and a single crossbar to the 110 kV traction powerline Stuttgart/Zazenhausen-Eutingen |
|
Harald | 2020-06-23 02:34:57 |
800 x 534, 902 кБ Base of Tower 46 of Facility 318 (Powerline Pulverdingen-Oberjettingen) situated west of Magstadt, Baden-Württemberg, Germany |
|
Harald | 2020-06-23 02:33:56 |
800 x 1200, 1629 кБ Tower 46 of Facility 318 (Powerline Pulverdingen-Oberjettingen) situated west of Magstadt, Baden-Württemberg, Germany |
|
Harald | 2020-06-22 02:42:12 |
800 x 1200, 1586 кБ Tower 46 of Facility 318 (Powerline Pulverdingen-Oberjettingen) situated west of Magstadt, Baden-Württemberg, Germany at night |
|
Harald | 2020-06-20 04:32:11 |
800 x 534, 717 кБ Facility 622, Tower 1 |
|
Harald | 2020-06-20 04:30:36 |
800 x 450, 538 кБ Sign on the angle suspension tower |
|
Harald | 2020-06-20 04:29:14 |
800 x 1200, 1401 кБ A further picture of this angle suspension tower |
|
Harald | 2020-06-20 04:27:49 |
800 x 1200, 1364 кБ The traction power line to Eutingen has in its further course in Ehningen an angle suspensio tower. Such towers are very rarely in Germany, as for direction changes of power lines strainers are preferred. |
|
Harald | 2020-06-20 04:23:58 |
800 x 1200, 1456 кБ Approximately 50 metres westnorthwestly from Tower 66 of Facility 318, there is Tower 7590 of traction power line Stuttgart/Zazenhausen - Eutingen. It is also a branch pylon. The conductors leaving the picture on the right run to Stuttgart/Zazenhausen, the conductors leaving the picture on the left run to Stuttgart/Rohr and the others run to Eutingen. |
|
Harald | 2020-06-20 04:18:06 |
800 x 534, 59 кБ Tower 1 of Facility 622 |
|
Harald | 2020-06-20 04:17:06 |
800 x 1200, 1687 кБ Tower 66 of Facility 318 (large tower) und Tower 1 of Facility 622 (small tower). The circuit running over Tower 1 of Facility 622 is at present run with 20 kV. The conductors of the second branching circuit are fixed on the body of Tower 66 of Facility 318. In earlier times there was an interconnection to the conductrs of the lowest crossbar above its fixage point. |
|
Harald | 2020-06-20 04:12:14 |
800 x 1200, 1510 кБ Tower 66 of Facility 318. The small tower left from the left tree is Tower 1 of Facility 622.
Tower 66 of Facility 318 is since 1977 a branch tower of the 110 kV-circuit. The branch runs to a semiconductor works a few kilometres eastly. Since the shutdown of this work, one circuit is unused and the other operated with 20 kV. |
|
Harald | 2020-06-20 04:07:58 |
800 x 1200, 1691 кБ Tower 66 of Facility 318 (large tower) und Tower 1 of Facility 622 (small tower). Both stand on a hill between Sindelfingen-Darmsheim and Ehningen. |
|
Harald | 2020-06-20 04:05:13 |
800 x 1200, 1333 кБ Tower 65 of Facility 318 from an other point of view |
|
Harald | 2020-06-20 04:04:04 |
800 x 534, 629 кБ Tower 65 of Facility 318 and Tower 129 of Facility 4508. These towers are situated between Ehningen and Sindelfingen-Darmsheim. |